End to end utilities design and installation service

EDA were appointed as primary utilities consultant and contractor on a multi-million pound commercial and residential development close to London’s Kings Cross Station. Our responsibility being to design a full utilities solution and installation within a very challenging site.

The challenge

The contract involved the following activities:

  • Liaison with Distribution Network Operators for connection and load appraisals.
  • Assessment and calculation of gas, water, electric and CHP requirements.
  • Design of multi-utility network on site.
  • Design, procurement and installation of substation and gas booster station.
  • Installation and project management of combined utility network across the site.
  • Managing and completing necessary diversionary work.
  • Full responsibility for negotiating with and facilitating adoption agreements with the preferred IDNO and IGT.

The end result

EDA delivered a multi-utility design and is currently installing the infrastructure to bring the project to life.

Contact us

Find out how EDA can help you can help you

Call: +44 (0)20 7183 6989
Email: info@edonald.com

Request a callback

Client: Undisclosed
Location: London, UK
Date: 2014-2015
Project: End to End
Sector: Construction
Services: Multi-Utility Review; Design, Procurement and Installation; Connections and Diversions; Project Management